Work on the construction of the Sremska Rača - Kuzmin motorway section with a bridge over the Sava River is underway. The route, which is designed as a classic motorway profile with two driving lanes and one emergency lane for each direction of travel and a median strip, starts from the graded Kuzmin intersection, where it intersects with the existing E-70 motorway.
Two graded intersections are being built on the route designed for a speed of 130 km/h, the first Kuzmin 1, as a connection between two motorways, Belgrade-Zagreb and Kuzmin-Sremska Rača, and the second, the Bosut intersection.
In addition to the bridge over the Sava River near Sremska Rača, the construction of a border crossing is also planned.
You can watch the video at the link.
Follow the Company's official accounts on social media and YouTube channel and stay up to date with all the latest news!
