Brochura PE "Roads of Serbia"

Brochure 2017 can be downloaded in ".pdf" format by clicking here.
You can read the brochure online by clicking on the image above.
Brochure 2012 can be downloaded in ".pdf" format by clicking here.
You can read the brochure online by clicking on the image above.
Brochure 2010 can be downloaded in ".pdf" format by clicking here.
You can read the brochure online by clicking on the image above

PE "Roads of Serbia" Newsletter

Newsletter 22|23

Twenty-second/twenty-third newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 20|21

Twenty/twenty-first newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 18|19

Eighteen/nineteenth newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 16|17

The Sixteen/seventeenth newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 13|14|15

The highlights are the following:

• Introduction - Zoran Drobnjak, acting director, PE “Roads of Serbia”
• Interview - prof. dr Milan Vujanić, president of Supervisory Board, PE “Roads of Serbia”
• New bridge over the Sava at Ostružnica
• Toll per travelled kilometer
• Beginning of the construction of toll station Vrčin
• Construction of the section Srpska kuća - Levosoje

Thirteenth / fourteenth / fifteenth newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 12

The highlights are the following:

May floods 2014
- Never to be forgotten

The twelfth newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 11

The highlights are the following:

• Heroic deed of road workers
• Management from one center for the first time
• Completed rehabilitation of old bridge over the Danube at Beška
• The First International Scientific Professional Conference "Modern Road Maintenance"
• Completed land acquisition in 2013
• Competition of children’s drawings "Santa's Magical Plant"

The eleventh newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 10

The highlights are the following:

• New kilometers of roads
• Traffic safety – joint actions and measures
• New Supervisory Board of the PE “Roads of Serbia”
• Records and inventiveness of the Sector for Toll Collection
• PE “Roads of Serbia” in the EU integrations
• New segments “Bridges databases”

The tenth newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 09

The highlights are the following:

• Database on dangerous locations on state roads
• Roads maintenance – pursuant to the conditions and funds
• Public invitation for the construction of “Petlovo brdo” Interchange and “Orlovača” Interchange (II phase)
• Presence of our Enterprise in the media in the previous year
• Webpage of the PE “Roads of Serbia” – an increasing number of visitors

The ninth number of the Newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 08

The highlights are the following:

• We review the work of all sectors of the company in the past year. This release marks the second anniversary of our success

The eight number of the Newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 07

The highlights are the following:

• Gazela Bridge passed the second test
• ITS systems on the Serbian road network – management – monitoring – safety
• Interview – Miodrag Milijić, President of the Independent Union of the PE “Roads of Serbia”
• Vehicle flow from June – August 2012
• Construction of Corridor X – Levosoje- border with FYR of Macedonia
• Rehabilitation of I A Category section no. 6, Brodarevo – Gostun

The seventh number of the Newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 06

The highlights are the following:

• We perform business activities in line with the highest international standards
• Adopted Business Program
• Rehabilitation of the old bridge over the Danube at Beška
• Gazela Bridge passed the first test
• Remedial works on road network throughout Serbia
• Leaflets – avoid traffic jams – use Bypass
• Department for Public Relations – Synonym for successfully completed work

The sixth number of the Newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 05

The highlights are the following:

• Complete Rehabilitacion of the Gazela Bridge
• Winter service - excellent 5
• Modernization of Toll Collection System
• Interview with Milenko Caković, M.Sc.
• Interview with Zoran Pešević, B.Sc. (T.E)
• Efficient Road Network Management
• The PR "Roads of Serbia" has successfully passed the first phase of quality system certification test
• Belgrade Bypass
• New Website Appearance

The fifth number of the Newsletter can be downloaded in ".pdf" format by clicking on the image above.

Newsletter 04

The highlights are the following:

• Gazela in "a full leap"
• Connection between the Republic of Srpska and Serbia
• Interview with Branko Zec, b.ec
• Interview with Goran Tomić, ll.b
• Started working winter service
• Contest of children's drawings with "Santa Claus on the road" theme

The fourth number of the Newsletter can be downloaded in .pdf format clicking on the image above.

Newsletter 03

The highlights are the following:

• New Beška Bridge is opened to traffic
• Interview with Zoran Stojisavljević, B. Sc.C.E.
• Gazela Bridge Rehabilitation
• Environmental Protection
• Lower tolls for vans
• Acknowledgement of the tradition preservation

The third number of the Newsletter can be downloaded in PDF format by clicking on the image above.

Newsletter 02

The highlights are the following:

• Toll collection revenue increased by 860,000 EUR a year
• Interview with Mrs. Biljana Vuksanović, B.Sc.C.E.
• Interview with Mrs. Gordana Subotički – Đorđević, B.Sc.C.E.
• Main span of the Beška Bridge connected
• Corporate Agreement signed
• Road network on Geoportal

The second number of the Newsletter can be downloaded in PDF format by clicking on the image above.

Newsletter 01

The highlights are the following:

• Zoran Drobnjak, Dir. General: Achieved planned objectives
• Pride of the builders - the Beška Bridge
• Winter Service
• Automatic Traffic Counters
• Site Laboratories
• Athens Marathon Mastered

The first number of the Newsletter can be downloaded in .pdf format clicking on the image above.