PUTEVI SRBIJE: 7,960 VEHICLES PASSED THROUGH THE NEWLY OPENED SECTION OF THE MORAVIAN CORRIDOR, FROM INTERCHANGE ADRANI TO INTERCHANGE PRELJINA

Putevi Srbije informs the public that today, June 27, 2026, from opening to traffic at 9 a.m. to 4 p.m., on the newly opened section of the Moravian Corridor (Motorway E-761), from the Adrani interchange to the Preljina interchange:

  • Toll station Preljina: 3,619 vehicles
  • Adrani toll station: 4,34 1 vehicles

 TOTAL: 7,960 vehicles passed.


Print