- 01.09.23.Design and construction of highway E-763, section: Pakovraće-Požega with the statement of Vladimir Petrović, head of supervision
- 29.08.23. President Vučić visited the final works on the construction of the new bridge in Petrovac na Mlava
- 23.08.23. PE“ROADS OF SERBIA” and “MONTEPUT“ sign memorandum on business cooperation
- 21.08.23. Minister Vesić Visits Works on Construction of Interchange Jakovo
- 18.08.23. Construction of highway E-763, Pakovraće - Požega section
- 02.08.23. Construction of highway E-763, Pakovraće - Požega section
- 27.07.23 Construction of highway E-763, Pakovraće - Požega section
- 19.07.23. Promotion of the "Drive fresh" campaign at Toll Station "Belgrade"
- 16.07.23. Ana Brnabić and Dimitar Kovačevski visited the OPEN BALKAN mobile sales point - Preševo
- Open Balkan - mobile sale point Preševo
- 13.07.23. PE "Roads of Serbia" and "Hrvatske Autoceste" signed a memorandum on business cooperation
- 10.07.23. Studenti na praksi u JP "Putevi Srbije"
- 04.07.23. Promotion of the campaign "Drive fresh"
- 29.06.2023. Sector B-6, Belgrade Bypass Opened to Traffic
- 28.06.23. Opening of Sector 6 of the Belgrade Bypass
- 26.06.23 Final works - new video of the Belgrade Bypass
- 12.06.23. Final works on Sector 6 of the Bypass around Belgrade
- 31.05.23. The annex to the contract on the construction of the Jakovo loop was signed
- 17.05.23. Opening of the right lane of the Aleksinac - Ražanj highway
- 16.05.23. Opening of the expanded Stara Pazova toll station
- 24.04.2023. Construction of highway E-763, Pakovraće - Požega section
- 13.04.23. JPPS spremno za predstojeći praznik
- 01.04.23. Opening of the New Belgrade - Surčin section
- 31.03.23. Construction of the Belgrade Bypass, Sector 6
- 28.03.23. Pakovraće - Požega, the right pipe of the Laz tunnel has been breached
- 28.03.23. Construction of highway E-763, Pakovraće - Požega section
- 27.03.23. Works on the section New Belgrade - Surčin
- 26.03.23. Tag devices on sale at the Post of Serbia
- 24.03.23. Media conference - Campaigns and projects aimed at increasing traffic safety at the 55th International Automobile Fair in Belgrade
- 20.03.23. Construction of highway Kuzmin - Sremska Rača
- 19.03.23. Construction of the Belgrade Bypass, Sector 6
- 15.03.23. Motorway Novi Beograd - Surčin
- 14.03.23. Construction of the section Iverak - Lajkovac
- 14.03.23. Construction of Motorway E-763, Section Pakovraće - Požega
- 07.03.23. Construction of Motorway E-763, Section Pakovraće - Požega
- 01.03.23. Works on the bypass around Gornji Milanovac
- 24.02.23. PE “Roads of Serbia” at International Tourism Fair in Belgrade
- 14.02.23. Construction of Motorway E-763, Section Pakovraće - Požega
- 10.02.23. Works on the extension of GP Horgoš
- 10.02.23. Construction of highway Kuzmin - Sremska Rača
- 06.02.23. Motorway Novi Beograd - Surčin
- 01.02.23. Construction of Motorway E-763, Section Pakovraće - Požega
- 25.01.23. The final conference of the IPA cross-border cooperation project between Serbia and Hungary
- 24.01.23. Motorway Novi Beograd - Surčin, video cover
- 22.01.23. Opening to traffic bridge over the Sava river near Ostružnica
- 20.01.23. Construction of Motorway E-763, Section Pakovraće - Požega
- 11.01.23. President Vučić visited the works on the construction of a section of the Miloš Veliki highway, the New Belgrade - Surčin section
- 13.01.23. Construction of Motorway E-763, Section Pakovraće - Požega
- 09.01.23. Construction of Motorway E-763, Section Pakovraće - Požega
- 09.01.23. Construction of the Sremska Rača - Kuzmin highway
- CONSTRUCTION OF HIGHWAY E-763, SECTION PAKOVRAĆE - POŽEGA
- "3 seconds whole life" campaign - Keep a safe distance, save lives!
- Video "3 seconds whole life" - Keep your distance, save your life!
- Corporate movie PE "Roads of Srbia"