Installation of girders on future bridge on Belgrade Bypass

Works on the installation of seven girders on the future bridge no.27а over the ring road and the future motorway have been completed.

The works on the construction of the bridge are carried out as part of the construction of the Sector 6 of the Belgrade Bypass.  

Sector 6 comprises works on the construction of the full profile of the motorway from the tunnel Straževica to the interchange Bubanj Potok (including the interchange), in the length of 9.6 km. Complete construction of the right and the left side of the motorway is also required within the Sector 6, and that includes construction of the roadway, the tunnel Beli Potok, interchanges Avala and Bubanj Potok, as well as bridges.

You may watch the video of the installation of girders on the future bridge no.27а on: https://www.putevi-srbije.rs/index.php/sr/galerija/video-galerija/01-07-21-postavljanje-nosa%C4%8Da-na-budu%C4%87em-mostu-br-27a-na-obilaznici-beograda-preko-postoje%C4%87eg-kru%C5%BEnog-puta


Print