CONSTRUCTION OF SECTION NEW BELGRADE – SURČIN ON “ROADS OF SERBIA“ YоuTube CHANNEL

Works on the segment of the motorway Е-763 from New Belgrade to Surčin, in the length of 7.9 km are carried out in accordance with the planned time schedule.

The state road, section New Belgrade – Surčin, is located on the left bank of the river Sava, and is designed for the calculated speed of 80 km/h, with mild longitudinal slopes, and, once complete, will represent the shortest link between the city of Belgrade and the motorway Е-763 (“Miloš Veliki”).

The transverse profile of the state road is in the width from 30.70 m tо 38.20 m. Its design foresees two carriageway lanes, each with three traffic lanes, a median strip, shoulders on both sides, roadside landscaping, footpaths and two-way cycling lanes in one part. In order to connect traffic with the newly-designed roads, beside the roundabout at the beginning of the roadway, three more intersections and a partial cloverleaf interchange have been planned, with a road leading to the settlement Surčin and the river Sava bank.

Three bridges and three overpasses will be constructed for the thoroughfare of watercourses and local roads.

Watch the latest footage on the link: https://www.putevi-srbije.rs/index.php/sr/galerija/video-galerija/16-09-21-radovi-na-deonici-novi-beograd-sur%C4%8Din,-pokrivalica 

Follow new contents regularly, week after week, on the PE “Roads of Serbia”’s YouTube channel.

Watch and stay informed!


Print