20.11.19. Corridor 10 through Serbia completed

In the presence of President of Serbia, Aleksandar Vučić, Prime Minister of Bulgaria Bojko Borisov,  Prime Minister of Serbia Ana Brnabić, Deputy Prime Minister Zorana Mihajlović, numerous dignitaries and citizens from all over Serbia, sections of the eastern leg of Corridor 10, at the tunnel Bancarevo, were officially opened on 9th November 2019.

The opening of newly-constructed sections of the eastern leg of Corridor 10 for traffic, from Prosek to Crvena reka, has marked the completion of the construction of Corridor 10 through Serbia.

The section of the motorway Е-80 from Prosek to the border with the Republic of Bulgaria is 86.8 km long in total and consists of 87 bridges, 5 tunnels with modern equipment – “Bancarevo“, “Sopot“, “Sarlah“, “Pržojna padina“ and “Progon“, as well as 5 interchanges at junctions with multiple levels.

The completion of the eastern leg of Corridor 10 construction, using the shortest route, connects Western and Eastern Europe, Serbia and Bulgaria, and foremost two large Serbian counties – the Niš county and the Pirot county, where approximately 450,000 people live.

Contemporary traffic infrastructure also validates the geostrategic position of Serbia as a whole and opens a path to the markets of Southeast Europe and Asia. High-quality and efficient connection of the Republic of Serbia with its surroundings, the neighbouring countries most of all, and its active participation in integration processes of the West Balkans, Southeastern Europe and the Danube region is an imperative.